Complete solutions for all pump requirements

Vacuum & Air

Pressure Pumps

Gorgon Project - Barrow Island LNG Plant

Client: Chevron

Consultant: Kellog Joint Venture Gorgon

Product Details

Construction Village Fire Water Pump Set in accordance with AS2941-2008. Complete with one electric, one diesel and one jockey pump.

Pump Supply

 2 x ISO-Pro Centrifugal Pump with 316 ss Casing, Impeller and Shaft; and oil Lubricated heavy duty tapered roller bearings with constant level oiler.

Electric Package

 Above pump with 1 x Siemens 45kW 2 Pole Ex'n Electric Motor according to Chevron specifications (Duty: 90m3/h @ 89.1 metres TDH)

Diesel Package

 Same pump with 1 x MTU Detroit Diesel D703LTFP Diesel Engine; Turbo Charged, Water cooled, 90 litre fuel tank, suitable for 6 hours operation with Murphy EL150K1 low level switch. Exhaust fitted with spark arrestor, flame arrestor with heat 7 corrosion resistant coating, Jacket water pump and oil pump (Duty: 90 m3/h @ 89.1 metres TDH)

Jockey Pump Package

 Vertical Multistage Jockey pump with 1 x Siemens Ex'n 0.75 kW 2 Pole motor (Duty: 90m3/h @ 89.1 metres TDH)

Control Panel

 Mounted on vibration isolators including all wiring and terminations within the terminal limits; specified to AS2941-2008, 316 Stainless Steel IP56 Cabinet

 

Fire Pump Package also included performance and functional testing in accordance with AS2941-2008, and vibration & noise testing.

Fire Pump

Enquire about our Fire Pump Systems

Other Projects

We are members of the following associations: